header_service  
Marine Engineering
Air-bag Technology
IMG_4171
Dredging Works & Reclamation

TWOME has taken undertaken dredging works project which involve in the deepening of the seabed for the purpose of Waterw...
load-out-of-ship-section-tn
Load-out of Ship Section & Lift-boat

Our versatile air-bag technology enables us to provide a load-out method for transfer of vessels from level ground (quay...
JSB Project 5 December 2011_c
Berth & Jetty Construction

TWOME has taken undertaken Berth and Jetty Construction which we specialize in Earthworks, Piling, Pre-boring, Tie Back ...
upslip-vessel-tn
Up-slipping of Vessel for Repair

Apart from launching, our air-bags can also be utilised for up-slip operations. The process is similar to de-docking, ex...
header_announcement
  • PT.Tiong Woon Oasis (A Subsidiary of Tiong Woon Oasis Pte Ltd) has successfully completed aLaunching operation of 9000 tonnes floating dock Length : 220m x Width : 48m on 07th May 2015 at PaxOcean PT. Drydocks World Pertama, Batam, Indonesia ...
  • PT.Tiong Woon Oasis (A Subsidiary of Tiong Woon Oasis Pte Ltd) has successfully completed a Alignment operation to connect 2 section of 4500 tonnes floating dock hull which total Length : 220m x Width : 48m on 28th Feb 2015 at PaxOcean PT. Drydocks World ...
  • PT.Tiong Woon Oasis (A Subsidiary of Tiong Woon Oasis Pte Ltd) has successfully completed a Up Slip operation of a 4500 tonnes floating Dock which Length: 110m x Width: 48m (Rear Side) on 13th Jan 2015 at PaxOcean PT. Drydocks World Pertama, Batam, Indone...
  • PT.Tiong Woon Oasis (A Subsidiary of Tiong Woon Oasis Pte Ltd) has successfully completed a Up Slip operation of a 4500 tonnes floating Dock which Length: 110m x Width: 48m (Forward Side) on 6th Jan 2015 at PaxOcean PT. Drydocks World Pertama, Batam, Indo...
  • PT.Tiong Woon Oasis (A Subsidiary of Tiong Woon Oasis Pte Ltd) has successfully completed a launching operation of a 14000 tonnes Submersible Barge on 10th March 2015 at PaxOcean PT. Drydocks World Pertama, Batam, Indonesia ...
  • We are excited to announce that another world record was created by using airbags technology to Up Slip a submersible barge which lightship is 14000T with 2.4meters draft. PT.Tiong Woon Oasis (A Subsidiary of Tiong Woon Oasis Pte Ltd) has successfully co...
  • Tiong Woon Oasis Pte Ltd has successfully completed a load-out operation of a 3868 Tonnes Lift-boat (H1018) onto a submersible barge on 28th March 2015 at TRIYARDS SSY, Vietnam.
  • Tiong Woon Oasis Pte Ltd has successfully completed a load-out operation of a 3540 Tonnes Lift-boat (H1017) onto a submersible barge on 2nd Dec 2014 at TRIYARDS SSY, Vietnam.
  • Tiong Woon Oasis Pte Ltd has successfully launched 1 unit of Platform Supply Vessel NT8002 which weighing 3200 Tonnes on 26th July 2014 at DDW PAXOCEAN Shipyard Pte Ltd.
  • Tiong Woon Oasis Pte Ltd has successfully launched two units of Semi-submersible Pontoon, each weighing 3000 Tonnes on 18th and 24th June 2014 at Jurong SML Pte Ltd (A Subsidiary of Sembcorp Marine)
header_successfulproj